Optimization of the Production Process using the Theory of Constraints (TOC) Method based on Drum-Buffer-Rope (DBR) Improvements

Destiara Nabila Widyarsa, Rr. Rochmoeljati

Abstract


One footwear manufacturing company located in Surabaya has experienced an increase in production demand for both women's and men's sandals in recent years. The main issue faced by the company is the presence of bottlenecks at specific workstations due to unbalanced capacity, which disrupts the smooth flow of the production process. To address this issue, the study applies the Theory of Constraints (TOC) method based on the Drum-Buffer-Rope (DBR) concept, in combination with Linear Programming (LP). The research stages include identifying the constraints, exploiting the constraints, subordinating non-constraints, and elevating the constraints. The analysis results indicate that the coating and bonding workstations are the main constraints affecting the system's throughput. To overcome this, overtime was added at these workstations to increase production capacity. The implementation results showed an improvement in throughput from IDR 39,849,260 with 1,594 units to IDR 46,490,330 with 1,860 units, reflecting a 14.3% increase. These findings demonstrate that the application of TOC and DBR can effectively balance the production flow, optimize bottleneck workstations, and enhance overall production throughput.

Keywords


bottleneck; drum buffer rope; slippers; theory of constraint

Full Text:

PDF

References


E. Aryanny and A. Paramitha, “Optimalisasi Kapasitas Stasiun Kerja dengan Metode,” J. Ris. dan Konseptual, Vol. 9, No. 4, pp. 1011–1021, 2024.

H. Henny, I. Andriana, and J. Ramadhan, “Perbaikan Posisi dan Postur Pekerja pada Operator Produksi Tahu UKM Subang,” J. Pengabdi. Tek. dan Ilmu Komput., Vol. 2, No. 1, pp. 33–38, 2022, doi: 10.34010/petik.v2i1.7559.

Seli, P. P. Ardika, Afifah, and C. Anggraiyani, “Penerapan RCCP dan TOC untuk Optimalisasi Stasiun Kerja dalam Proses Produksi di Bengkel Cor Logam Sentosa Jaya,” J. Mech. Eng., Vol. 2, No. 1, pp. 1–9, 2025.

M. Ahyan, E. Kotto, and U. N. Harahap, “Usulan Perbaikan Lintasan Produksi dengan menggunakan Metode Theory of Constraint dan Metode Moddie Young,” J. Vor., Vol. 2, No. 1, pp. 59–70, 2021, doi: 10.54123/vorteks.v2i1.36.

H. Hasanah, A. Fatimah, and K. Ekasari, “Pendekatan Theory of Constraints untuk Peningkatan Laba,” J. Akutansi Indones., Vol. 16, No. 1, pp. 1–13, 2020.

R. P. Kemaluddin and E. Prasetyaningsih, “Perbaikan Stasiun Kerja Bottleneck melalui Penerapan Theory of Constraint di PT. Pindad (Persero),” Bandung Conf. Ser. Ind. Eng. SCI., Vol. 2, No. 2, pp. 262–270, 2022, doi: 10.29313/bcsies.v2i2.3562.

A. A. Agraprana and D. S. Donoriyanto, “Optimization of Production Process by Applying Theory of Constraint ( TOC ) at CV . Wijaya Mandiri Label,” IJIEM (Indonesian J. Ind. Eng. Manag., Vol. 5, No. 1, pp. 192–200, 2024, doi: 10.22441/ijiem.v5i1.22515.

G. Hamidah and Hastuti, “Penerapan Theory of Constraints (TOC) untuk meningkatkan Kapasitas Produksi dan Laba Perusahaan (Studi Kasus pada UMKM Keripik Sari Asih),” Indones. Account. Lit. J., Vol. 5, No. 2, pp. 124–138, 2025.

A. Bidiawati and L. Setiawati, “Kajian Drum-Buffer-Rope berbasis Theory of Contraint untuk menyeimbangkan Aliran Produksi,” Ina. J. Ind. Qual. Eng., Vol. 8, No. 1, pp. 59–68, 2020, doi: 10.34010/iqe.v8i1.2764.

J. A. Widiawati and A. A. Sibarani, “Usulan Penjadwalan Flow Shop dengan Metode Drum buffer rope dan Campbell, Dudek, Smith (CDS) untuk mengurangi Keterlambatan d Perusahaan Tekstile,” Electr. Eng. Informatics, Ind. Technol. Creat. Media, Vol. 4, No. 1, pp. 245–258, 2024, [Online]. Available: https://core.ac.uk/download/pdf/299926805.pdf

M. V Shamuvel, Pandit, and G. R. Naik, “Application of Theory of Constraints on Scheduling of Drum-Buffer-Rope System,” IOSR J. Mech. Civ. Eng. (IOSR-JMCE, pp. 15–20, 2020.

A. Bakhtiar et al., “Penerapan Drum-Buffer-Rope pada Stasiun Bottleneck PT Phapros Semarang dengan Theory of Constraint,” Pros. Ind. Eng. Conf., pp. 70–76, 2020.

A. Y. Pradana and F. Pulansari, “Analisis Pengukuran Waktu Kerja dengan Stopwatch Time Study untuk meningkatkan Target Produksi di PT. Xyz,” Juminten, Vol. 2, No. 1, pp. 13–24, 2021, doi: 10.33005/juminten.v2i1.217.

A. P. Utama and D. E. A. Prasetio, “Menggunakan Metode Rought Cut Capacity Planning ( RCCP ) dalam menentukan Kapasitas Produksi Batu Bata,” Pros. Semin. Nas. Forkepti I4.0 Tek. dan Manaj. Ind., Vol. 1, pp. 26–35, 2021.

V. I. Tutuarima, R. Narendra, R. Akbarita, and G. T. Swastika, “Tcomparison of Profit Optimization using Linear Programmming and Cutting Plane Methods (Case Study : Home Industry Potatora Bakery),” Proc. Int. Semin. Business, Educ. Sci., Vol. 1, No. August, pp. 98–106, 2022, doi: 10.29407/int.v1i1.2679.




DOI: https://doi.org/10.32520/stmsi.v14i4.5292

Article Metrics

Abstract view : 107 times
PDF - 23 times

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.