The Impact of Commitment to Software Quality on Project Management Performance

Shaymaa Ahmed Chyad

Abstract


This paper aims to address project management solutions based on three key requirements for software management project development" project execution, software quality, and implementation of Level 2 (Managed) practices in the Capability Maturity Model Integration (CMMI)". Project execution relies on effective organization and management of project personnel, especially for large projects or multiple projects being carried out simultaneously. Successful execution also depends on institutionalized management of project resources, which is supported by Level 2 process areas of CMMI.in the framework of total quality management, both the degree of project execution and execution capability have a direct impact on software quality. Therefore, this study investigates how software organizations can strengthen project execution and execution capabilities to enhance software quality through three perspectives: abstract object-oriented project organizational structure, project development models, and CMMI Level 2 project management practices.

Keywords


capability maturity integration model; project management; software quality

Full Text:

PDF

References


M. S. Ahmed, "Optimizing Software Life Cycle Processes through ISO/IEC/IEEE Harmonization Strategies," IEEE Transactions on Software Engineering, Vol. 50, No. 1, pp. 14–29, Jan. 2024, DOI: 10.1109/TSE.2023.3325114.

N. H. Malik, "Global Adoption and Performance Analysis of Software Engineering Process Maturity Models," Journal of High Technology Management Research, Vol. 33, No. 2, p. 100438, Nov. 2022, DOI: 10.1016/j.hitech.2022.100438.

J. P. Lewis and E. K. Thompson, "A Rigorous Evaluation of Software Metrics and Process Compliance in Distributed Engineering Environments," Empirical Software Engineering, Vol. 25, No. 5, pp. 3810–3834, Sep. 2020, DOI: 10.1007/s10664-020-09852-x.

Y. Takahashi and M. Sato, "Standard Appraisal Methodologies for Process Appraisals: Ensuring Predictive Quality Controls," Systems Engineering, Vol. 24, No. 4, pp. 245–261, Jul. 2021, DOI: 10.1002/sys.21575.

C. Ebert and M. Kuhrmann, "Knowledge Management in Software Engineering: Practices and Tools," IEEE Software, Vol. 40, No. 3, pp. 18–25, May–June 2023, DOI: 10.1109/MS.2023.3243912.

J. Wang and Y. Zhang, "Structured Systems Analysis and Design Methodologies: Evaluating Durability and Logical Error Reduction," Journal of Software Engineering and Applications, Vol. 15, No. 3, pp. 85–98, Mar. 2022, DOI: 10.4236/jsea.2022.153005.

A. R. Ahire and B. Dreyfus, "Total Quality Management (TQM) Principles and Long-Term product quality in technical workflows," International Journal of Total Quality Management & Operational Excellence, Vol. 28, No. 4, pp. 501–518, Nov. 2021, DOI: 10.1080/14783363.2021.1920401.

N. R. Mead and E. Blackstone, "The Impact of Human Factors on Requirements Engineering: A Systematic Review," IEEE Software, Vol. 39, No. 5, pp. 62–70, Sep.–Oct. 2022, DOI: 10.1109/MS.2022.3165502.

H. K. Kim, "Disciplined Project Tracking and Systematic Risk Management as Baselines for On-time Software Delivery," International Journal of Software Project Management, Vol. 9, No. 2, pp. 112–126, Jun. 2023, DOI: 10.4018/IJSPM.2023060102.

L. Garcia and M. Fernandez, "The Impact of Process Standardization and Maturity Level 2 Practices on Project Replication," Journal of Computer Systems Science, Vol. 84, No. 1, pp. 45–59, Jan. 2021, DOI: 10.1016/j.jcss.2020.08.003.

S. Martinez and T. Nguyen, "Synthesizing Agile Flexibility with Strict Configuration Controls in Software Engineering," Journal of Systems and Software, Vol. 195, p. 111520, Jan. 2023, DOI: 10.1016/j.jss.2022.111520.

R. Schnetler, H. Steyn, and C. C. van Waveren, "Characteristics of Matrix Structures Influencing Project Success," International Journal of Project Management, Vol. 42, No. 1, p. 102550, Jan. 2024, DOI: 10.1016/j.ijproman.2023.102550.

P. S. Jones and L. M. Smith, "Connecting Personnel Capability Maturity Models with Asset Traceability and Technical Documentation," Journal of Organizational Competency and Maturity, Vol. 12, No. 2, pp. 142–156, Jul. 2020, DOI: 10.1108/JOCM-04-2020-0115.

R. Turner and M. Huemann, "Human Resource Management in the Project-Oriented Organization," International Journal of Project Management, Vol. 40, No. 4, pp. 310–324, May 2022, DOI: 10.1016/j.ijproman.2022.03.004.

C. G. Worley and E. E. Lawler, "Designing Agile Matrix Organizations: Resolving Authority conflicts and deadlocks," Human Resource Management, vol. 61, no. 4, pp. 411–427, Jul. 2022, DOI: 10.1002/hrm.22105.

L. F. Capretz, "The Crucial Role of Human Factors, Cognitive Styles, and Team Formations in Software Development Success," Computers in Human Behavior, Vol. 116, p. 106651, Mar. 2021, DOI: 10.1016/j.chb.2020.106651.

F. Ricci and G. De Luca, "Object-Relational Mapping and Database Lifecycle Design in Modern Concurrent Project Tracking," ACM Transactions on Database Systems, Vol. 46, No. 2, pp. 71–88, Jun. 2021, DOI: 10.1145/3447242.

K. Hansen and O. Nielsen, "Evaluating Process Capability Assessments: Empirical Validation of Modern Capability Metrics," Journal of Software: Evolution and Process, Vol. 34, No. 8, p. e2451, Aug. 2022, DOI: 10.1002/smr.2451.

V. Kumar and S. Sharma, "Process Excellence Training Models and the Institutionalization of Configuration Controls," Strategy & Leadership, Vol. 51, No. 3, pp. 33–42, May 2023, DOI: 10.1108/SL-01-2023-0005.

T. O'Connor and P. Sullivan, "System Analysis Paradigms for Aligning Task Assignment and Technical Documentation Controls," Information and Software Technology, Vol. 122, p. 106280, Jun. 2020, DOI: 10.1016/j.infsof.2020.106280.

T. C. Douglas and J. S. Judge, "Total Quality Management and Operational Excellence: Structural Alignment in High-Tech Firms," Total Quality Management & Business Excellence, Vol. 32, No. 11, pp. 1289–1306, Sep. 2021, DOI: 10.1080/14783363.2020.1717335.

R. M. Fontana, U. Meyer, and S. Reinehr, "Agile Maturity Models: A Systematic Mapping Study," Computer Science Review, Vol. 41, p. 100414, Aug. 2021, DOI: 10.1016/j.cosrev.2021.100414.

A. Al-Rubaie and K. J. McCarthy, "Process Assessment and Evolutionary Quality Standards in Contemporary Software Lifecycle Infrastructure," International Journal of Information Management, Vol. 68, p. 102570, Feb. 2023, DOI: 10.1016/j.ijinfomgt.2022.102570.

D. M. Avelar and J. A. Rodrigues, "Core Quality Frameworks and Staged Representations in Concurrent Multi-Project Configurations," Journal of Operations Management, Vol. 64, No. 6, pp. 782–799, Sep. 2018, DOI: 10.1016/j.jom.2018.08.001.

M. Martinsuo and J. Geraldi, "Management of Project Portfolios: Relationships Rather than Isolated Decisions," International Journal of Project Management, Vol. 38, No. 7, pp. 420–430, Oct. 2020, DOI: 10.1016/j.ijproman.2020.06.002.




DOI: https://doi.org/10.32520/stmsi.v15i9.6819

Article Metrics

Abstract view : 0 times
PDF - 0 times

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.